Housing Construction Progresses Apace in Hwasong Area of DPRK

Pyongyang, September 5 (KCNA) -- The builders of 10 000 flats at the fourth stage in the Hwasong area of the DPRK are speeding up the projects of each process, giving priority to the quality of buildings.

The headquarters for building 50 000 flats in Pyongyang Municipality has made all construction units establish a well-regulated system of quality inspection, ensure quality and neatly arrange the surroundings of construction sites.

It organized demonstrations according to processes including tiling of exterior walls to raise the level of skilled workers and intensify technical guidance to interior finishing projects, curbstone project and landscaping.

The regiment of the Phyongjin Management Bureau for Construction under the brigade of the Pyongyang Construction Commission finished the plastering of exterior walls by applying rational working methods and is pushing ahead with the installation of plastic windows and interior tiling.

The battalion of the Ministry of Land and Maritime Transport of the first brigade of the ministries and national agencies is solving technical problems arising in the installation of door frames while ensuring the quality of construction.

The battalion of the Ponghwa Trade Bureau of the second brigade of the ministries and national agencies is reinforcing skilled workers and sharing advanced construction methods and construction techniques. -0-

www.kcna.kp (2025.09.05.)