Pyongyang, April 12 (KCNA) -- The Chonnaeri Cement Factory in the DPRK is carrying out its daily cement production plan at 105 percent on average.
Its general control room has contributed to the optimization of production control by responsibly operating equipment and processes ranging from input of raw materials to production.
The plasticizing workshop has intensified the field study of technology and ensured normal operation of kiln, main exhauster and other equipment. The cement workshop has responsibly conducted inspection and maintenance of equipment.
The raw materials workshop is ensuring the timely supply of raw materials through close inter-process coordination.
The limestone mine has pushed ahead with the work to improve the blasting efficiency and improve the performance of mining and transportation equipment.
The ore-conveying shop and the fine coal shop, too, have made successes by waging a collective technical innovation movement for saving materials and preventing environmental pollution. -0-
www.kcna.kp (2026.04.12.)