Fifth-Stage Housing Construction Project Promoted in Hwasong Area of DPRK

Pyongyang, June 5 (KCNA) -- The builders of the Paektusan Hero Youth Shock Brigade speed up the fifth-stage housing framework project in the Hwasong area in real earnest.

The Brigade'a command team has conducted information and motivation work in various forms and methods while intensifying the reviewing and evaluation so that all units push ahead with the project with the main emphasis on ensuring the quality of structures.

The High-Speed Youth Shock Brigade completed the concrete tamping of the foundation of more than 10 000 cubic meters and is giving precedence to the supply of materials over construction.

The Kaesong Municipal Brigade set the main link in the whole chain of the project and strengthens cooperation among processes.

The Rason Municipal Brigade organized a steel bar processing team, steel bar assembling team and form assembly team to raise the level of specialization in construction and has made progress in the foundation projects for infrastructure and service amenities.

The Pyongyang Municipal Brigade and the South Hwanghae Provincial Brigade are ensuring the quality of construction and introducing advanced construction methods and techniques. -0-

www.kcna.kp (2026.06.05.)